New Crane and other stuff

The former OGN yard is now Smulders Projects. The have installed a 3200 – tonne capacity, Sarens crane and will also install a new gantry crane. The structure on its side will take the yellow towers, 12 of which are on site and visible below the crane.

The wind turbine bases  in the Wallsend dry dock are nearing completion.

Advertisements
This entry was posted in Tyne. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s