Trouble at t’dock

The five turbine towers at Neptune dock were due to be moved out on the spring tides ~23rd June. Unfortunately the dock gate collapsed leaving 4 tugs with nothing to do until a) the gate is repaired and b) the next spring tides. Floating barge-crane Matador arrived to lift the lock gate, with tugs Jan Leenheer and En Avant 1. Watch this space.

 

Advertisements
This entry was posted in Tyne. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s